Help · Bill details

The application in the cabinet, step by step

Three steps: you and the site, the equipment, documents and submission. Half an hour is usually enough with the bill at hand.

What to prepare

  • An electricity bill or a statement from your distribution system operator (DSO) with the EIC code. See Where to find the EIC code.
  • A document that proves your right to the site: an extract from the property register or a lease. See Which documents are needed.
  • What the equipment is: manufacturer, model, power. A photo of its nameplate works too.

Step 1. You and the site

Choose who the connection is for: «For home» (a flat, a house, a summer house; the owner applies for themselves) or «For business» (a company, a sole proprietor, an OSBB or a cooperative).

  • For home — full name and RNOKPP tax number (10 digits, as in Diia).
  • For business — the full name as in the state register (EDR) and the EDRPOU code (8 digits), or the RNOKPP for a sole proprietor.
  • The site — its address: you pick the settlement from the list of the state codifier (KATOTTG).
  • The bill data — the EIC code, the distribution system operator, the supplier and the permitted capacity. The cabinet fills in the DSO and supplier from the settlement; if your bill names another company, start typing its name.

Step 2. Equipment

Add the equipment on each site: type, manufacturer, model, power, and capacity for storage. The cabinet asks a few questions that depend on the type, for example what happens to surplus solar energy.

Then choose how we will receive the data. SolaX Cloud connects automatically today. For other equipment choose «Later, Wesfin will help»: we agree the way to connect with you after the review.

Step 3. Documents and submission

The cabinet lists the documents for your equipment. Only two are needed before you submit: the bill or DSO statement with the EIC code, and a document proving your right to the site. The rest can follow after the review. See Which documents are needed.

On the last step check everything and send the application. We confirm by email.

After you submit

Wesfin reviews the application. While it is under review the data cannot be changed. If something needs fixing we return the application with an explanation: fix what we name and submit again. We write to the contact email about every decision.

Once approved, the application stays as it was approved. To add a site or equipment, send a change request on the «Application» page.

Didn’t find the answer?

Write or call us. Quote your application number if you have one: it helps us answer faster.