
Wesfin Energy
Engineering, design, integration and delivery of energy infrastructure.


Illustration
We invite you to become part of its collective power.
Join the VPPNEURC licence granted 13.10.2026, commercial services not live yetDay-ahead, intraday and balancing markets, and ancillary services. The market price changes every hour. Commercial aggregation services are not live yet.
How value is createdThe cloud platform brings different assets into one portfolio and shares the available flexibility between local tasks and market scenarios.
What Wesfin Flex doesWesfin Edge on site turns different devices and protocols into one model. Optimisation never bypasses the BMS, grid protection or local limits.
Technical detailsThe initial focus is energy storage and industrial controllable load. Other asset types are marked as future scope.
Types of flexibilitySoC means state of charge. You define a reserve that Wesfin Flex does not use: if it is 30%, for example, the charge below that level stays yours and only the rest can work. The 30% here is only an example.
One day of your batteryA battery often just holds its charge in case of an outage. Peak consumption is expensive, and the market price changes every hour. Keeping up with that by hand is hard, especially with mixed equipment. Wesfin Flex is preparing one control layer: you define a reserve that Wesfin Flex does not use, and the rest of the flexibility can work where that is technically and legally allowed.

Illustration
Wesfin Flex does not bind an energy asset to one use case. Available flexibility can be allocated between local objectives and market opportunities.

Reserve in this model: SoC 30%. Wesfin Flex does not use it.
Prices: day-ahead market. Data source: Market Operator JSC. The charging and discharging hours are calculated by the Wesfin optimiser for a model battery, and the state of charge is modelled. This is not data from a real installation and not a revenue forecast, and commercial services are not live yet.
The optimiser should allocate available flexibility according to prices, state of charge, technical constraints, degradation cost, local needs and commitments already made.
Actual economics depend on equipment, operating profile, metering, market prices, tariffs, degradation, imbalance exposure, regulation and contracts. Revenue is not guaranteed.
The platform identifies what an asset can do, connects it to a common model, keeps control within safe limits and prepares available flexibility for local and future market scenarios.
Assess consumption or generation profiles, technical characteristics, constraints and available flexibility.
Establish metering, communications and a compatible integration path through Wesfin Edge or another approved interface.
Send safe commands only within local limits and the asset’s actual availability.
Combine multiple resources into a coordinated portfolio while preserving each asset’s boundaries.
Allocate available flexibility between local use cases and eligible market scenarios.
Create economic value only where technically, commercially and regulatorily feasible.
Wesfin Flex is designed to grow beyond battery aggregation into a platform for multiple distributed energy resource types.

Illustration
Allocate available power and stored energy between local needs and eligible market scenarios.
A planned label does not mean a production-ready integration. Compatibility depends on equipment, protocols, metering, communications and safe external control.
Wesfin Edge normalises heterogeneous devices and protocols into a unified energy asset model so the cloud works with capabilities and constraints rather than vendor-specific register maps.

The platform should not depend critically on one storage, inverter, charger or vendor-cloud supplier.
If Internet connectivity is lost, Wesfin Edge continues safe local operation and never bypasses equipment protection.
The cloud sees asset capabilities and constraints instead of vendor-specific register addresses.
Market optimisation never bypasses hardware protection, the BMS, grid protection or local Wesfin Edge limits.
Core integrations rely on local industrial interfaces that Wesfin can validate and control.

Engineering, design, integration and delivery of energy infrastructure.

Connection, coordination and optimisation of distributed-energy flexibility.

Technical support, service capabilities and field maintenance for energy assets.
We are building a network of service companies and qualified specialists able to support equipment integration and maintenance across Ukraine.
The region list communicates target future coverage, not a confirmed current count or status of partners.
Wesfin Flex LLC was granted its aggregation licence on 13 October 2026 and is completing market onboarding. Regulated services activate after the required procedures and statuses are complete.
LICENCE GRANTEDPartly, by design. Under the agreement you give Wesfin Flex the right to control your equipment, but only with agreed commands and within agreed limits. Your agreement sets a reserve that Wesfin Flex does not use, and equipment protection always comes first. If there is a threat to people, equipment, the grid or a critical process, you can immediately limit or stop remote control. You can change the reserve through the cabinet; if you do so after an irrevocable market commitment, only documented costs caused by the change can be passed on to you.
Registering is not a contract. Participation starts with a separate agreement on taking part in an aggregated group, signed with a qualified electronic signature (КЕП). Its standard form for companies and sole proprietors is published on the regulatory information page, and individual terms are agreed in the annexes. Signing alone does not admit your equipment to the market: commercial operations begin only after the checks in the agreement are complete.
Yes. Send a request through the cabinet, or by email to flex@wesfin.energy with a qualified electronic signature (КЕП). Leaving is completed as soon as possible, and no later than 21 calendar days after we receive the request, followed by a final settlement. An exit fee is possible only within the law and must be proportionate. It cannot exceed Wesfin Flex’s direct documented losses or costs, including services already provided, and Wesfin Flex has to prove them. Any specific terms are set out in Annex 3.
The commercial model and remuneration are agreed individually in Annex 3 to the agreement. Possible components: a share of the net result, a management fee, a trading fee, a platform fee, and Wesfin Edge and integration.
If anything else is needed, our manager will call you. We will tell you about the next steps by email or another way; we are not naming dates yet.
No. Wesfin Flex is in preparation. Regulated services will begin only after the required procedures and a separate announcement.
Yes. Projects at concept, design or construction stage can also register.
No. If it is not known yet, you can register without it.
No. The initial focus is energy storage and industrial controllable load. The future architecture also includes generation, EV charging and flexible loads.
No. Outcomes depend on equipment, operating profile, market conditions, metering, regulation and future contracts. No revenue split applies by default.
Provide separate voluntary consent for updates in the future form or follow the official website.
Electricity markets, regulation and flexibility technologies — concise updates on changes that may affect energy assets and business decisions.
Approved Wesfin Intelligence publications will appear here automatically.

Illustration
Tell us about your storage, generation or controllable load: it takes a few minutes. An application is not a contract and does not start any service.