For energy-intensive businesses

Your business can

Managing a site’s energy has value even without the market. A battery is not required to start: a bill and a load profile are enough.

A bill that nobody manages

  • Dear hours

    You consume the most exactly when electricity costs the most.

  • Power peaks

    A few minutes of coinciding loads set the capacity bill for a month.

  • A blind spot

    You see the total at the end of the month, not which equipment created it and when.

First we count, then we manage

A business without a battery needs no aggregation to cut its costs. The flexibility we find can later earn as well.

  • Site assessmentWhere the money is in your profile

    Consumption profile, peaks, available flexibility and scenarios: without a battery, with one, with a solar plant.

    How it is paidThe initial screening is free. A detailed study is paid where it is needed.

    Open
  • Energy managementThe site runs cheaper every day

    Load shifting out of dear hours, peak limiting, storage and own generation in one schedule. Within the limits of your process.

    How it is paidIntegration and a recurring fee; possibly a share of verified additional savings.

    Preparing the first connections
  • Flexibility as incomeWhen the site is ready

    Flexible loads and storage can take part in market mechanisms as part of the Wesfin Flex portfolio.

    How it is paidA performance fee, a capacity fee or both.

    Not live yet

We count only the net result

Gross revenue looks good in a deck. You keep what is left after every cost. So we show every line.

  1. Lower electricity costCheaper hours, your own solar energy, lower power peaks
  2. Income from flexibilityafter market launchAdmitted assets taking part in market mechanisms
  3. Charging energy and lossesWhat the asset takes from the grid in order to give it back
  4. Market charges and imbalancesMarket fees and the cost of deviating from the schedule
  5. Equipment wearBattery cycles have a price, and we count it
  6. Agreed operating costsOnly those written into the agreement
  7. Net resultThis is what the statement shows and what our fee is counted from

Amounts appear only in your own calculation, from your data. They are forecasts, not a guarantee of income.

What works today

The aggregator licence is granted. Wesfin Flex runs preliminary assessments of sites and prepares the first connections. Commercial market participation becomes available once the required procedures are complete.

  1. Application to join

    Who you are, what you have, a contact. A few minutes, no contract.

    open

  2. Technical qualification

    We read your data and check what is possible.

    open

  3. Commercial proposal

    Assessment, optimisation or aggregation, depending on how ready the asset is.

    Not open yet

  4. Connection

    Wesfin Edge on site, metering, a trial.

    Not open yet

  5. Market and settlement

    Market admission, a monthly statement, payment.

    Not open yet

Aggregation licence
Granted · 13.10.2026NEURC resolution No. 1654, Wesfin Flex LLC. Documents
Market registration
In progressProcedures with the market operator and DataHub
Control of the first asset
In progressRead-only for now; commands after a separate permission and a trial
Commercial market participation
Not live yetA separate official announcement will follow

How much flexibility
is on your site?

The application takes a few minutes, is not a contract and commits you to nothing. Wesfin prepares the documents after that. The potential calculation is a forecast, not a guarantee of income.